Works on the installation of a summer water supply line in Almaly village, Almalinsky rural district, Atyrau city
Water supply
Year: 2023
Фотографии проекта
•
Стрелки / свайп
Projects: Works on the installation of a summer water supply line in Almaly village, Almalinsky rural district, Atyrau city
2023
The project includes installation of pumping stations with a capacity of at least 300 m³/h and a 37 kW electric motor. A high-pressure main pipeline of 2,004 m (d-160 mm) and a medium-pressure pipeline of 1,800 m (d-110 mm) will be laid. A 0.4 kV power supply line of 350 m with reinforced concrete poles will be installed. A 20 m² site will be prepared, a 12 m² concrete foundation constructed, and the required equipment, including a three-phase meter, will be installed.