Language

External power supply, 10 kV overhead power line from the PS-110/10 kV substation (in the SVHG area) to the SRG facility

Electric power supply Year: 2022

Фотографии проекта

Projects: External power supply, 10 kV overhead power line from the PS-110/10 kV substation (in the SVHG area) to the SRG facility 2022
The project предусматриes the construction of a double-circuit 10 kV overhead transmission line (OHL-10 kV) from the 110/10 kV substation (in the SVHG area) to the SRG facility. At the power intake point, a single-section 10 kV indoor switchgear (10 kV ISG) and a step-down power transformer TMH-1000/10/0.4 kV with a capacity of 1000 kVA will be installed to supply electricity to SRG consumers.

The construction site is located in Zhylyoi District of Atyrau Region, Republic of Kazakhstan. The distance to Atyrau city is 375 km and to Kulsary city is 135 km. The climatic construction zone is IVg, and the road-climatic zone is V (according to the Opornaya meteorological station data).

Construction works shall be carried out in accordance with the approved design documentation, СН RK 1.03-00-2011 “Construction Production. Organization of Construction of Enterprises, Buildings and Structures,” the Electrical Installation Code (PUE), and other applicable regulatory requirements of the Republic of Kazakhstan.