Power supply for the facilities of the Zhanakorgan–Shalkiya mine water pipeline located in the Zhanakorgan District of the Kyzylorda Region
Electric power supply
Year: 2020
Фотографии проекта
•
Стрелки / свайп
Projects: Power supply for the facilities of the Zhanakorgan–Shalkiya mine water pipeline located in the Zhanakorgan District of the Kyzylorda Region
2020
The Work Execution Plan has been developed to perform a full scope of construction and electrical installation works for the project “Power Supply of the Zhanakorgan–Shalkiya Mine Water Pipeline Facilities.” The works include construction of 35 kV overhead transmission lines, installation of 35 kV cable lines, pole erection, conductor stringing, grounding installation, power cable laying, cable joint installation, and commissioning tests. All works shall be performed in accordance with the design documentation, Electrical Installation Rules, construction standards, and applicable regulations of the Republic of Kazakhstan. The works will be carried out using specialized machinery, equipment, and personal protective equipment in full compliance with occupational health, industrial safety, fire safety, and environmental protection requirements. The Client is JSC “Shalkiya Zinc LTD”.