The project предусматривает construction and earthworks for deepening the Kushum River bank (Stage III) within the territory of the state hunting farm. The works are aimed at improving the hydrological condition of the riverbank area, clearing the channel, and ensuring bank stability.

The scope includes preparatory activities such as mobilization of personnel and machinery, geodetic layout, installation of safety fencing, and construction of temporary access roads. The main works include excavation of soil from underwater areas, removal of silt deposits and reed vegetation, dismantling of existing structures, loading and hauling of soil to designated dumping areas, followed by grading and land reclamation.

The works are performed using specialized equipment (excavators, bulldozers, dump trucks, and support vehicles) in compliance with occupational health and safety and environmental requirements, with final preparation of as-built documentation and handover of the facility to the client.