Construction of engineering and utility infrastructure (power supply) in Kigash village, Kurmangazy district, Atyrau region
Electric power supply
Year: 2019
Фотографии проекта
•
Стрелки / свайп
Projects: Construction of engineering and utility infrastructure (power supply) in Kigash village, Kurmangazy district, Atyrau region
2019
This Method Statement (Construction Work Execution Plan) has been developed for the crossing of a 10 kV overhead power line with railway tracks as part of the construction of engineering and utility infrastructure (power supply) in Kigash village, Kurmangazy district, Atyrau region.
The project includes a full scope of preparatory, earthworks, and electrical installation activities, including drilling of foundation pits, installation of extended reinforced-concrete poles type SV 164-12, backfilling with layer-by-layer compaction, and stringing of AS-50 conductors with installation of insulators.
The works will be carried out using specialized machinery, lifting equipment, and construction tools in compliance with the construction regulations of the Republic of Kazakhstan, electrical safety rules, occupational health requirements, and fire safety standards.
Special attention is given to safe execution of works within the railway zone, protection of existing communications, signaling and telecommunication lines, and ensuring uninterrupted railway operation. All works will be performed under a work permit system and supervised by responsible engineers and representatives of operating organizations.
The project includes a full scope of preparatory, earthworks, and electrical installation activities, including drilling of foundation pits, installation of extended reinforced-concrete poles type SV 164-12, backfilling with layer-by-layer compaction, and stringing of AS-50 conductors with installation of insulators.
The works will be carried out using specialized machinery, lifting equipment, and construction tools in compliance with the construction regulations of the Republic of Kazakhstan, electrical safety rules, occupational health requirements, and fire safety standards.
Special attention is given to safe execution of works within the railway zone, protection of existing communications, signaling and telecommunication lines, and ensuring uninterrupted railway operation. All works will be performed under a work permit system and supervised by responsible engineers and representatives of operating organizations.