Язык

Current repair of the electrical network in the Moltek-3 and Moltek-4 microdistricts in Miyaly village, Kyzylkoga district

Current repair of the electrical network in the Moltek-3 and Moltek-4 microdistricts in Miyaly village, Kyzylkoga district
The project site is located in Miyaly village, Kyzylkoga district, Atyrau region. The electricity consumers in the Moltek-3 and Moltek-4 microdistricts, connected to the designed VL-10kV and VL-0.4kV overhead lines, are: Moltek-3 and Moltek-4 microdistricts. To ensure reliable power supply to the designed facility, the project provides for: dismantling and installation of VL-10kV and VL-0.4kV supports using reinforced concrete poles of the SV-105 and SV-95 types. The total length of the VL-10kV and VL-0.4kV lines is 72.73 km. The designed VL-10kV and VL-0.4kV lines are installed on reinforced concrete poles of the SV-105 and SV-95 types, using the following conductors: AS-70 — 72,100 meters; SIP-3 — 630 meters. Pin-type insulators of the ShF-20-8 and TF-2001 types are used on intermediate supports. The underground parts of the SV-105 and SV-95 poles shall be protected against corrosion up to 0.5 m above ground level with a mastic coating.
Category: Electric power supply Completed: December 31, 2023