Phase 3. Current repair of the North Caspian Environmental Oil Spill Response Base in the village of Damba, Atyrau region – works on repair and painting of floors with epoxy-polyurethane coating, incl
Other
Year: 2023
Фотографии проекта
•
Стрелки / свайп
Projects: Phase 3. Current repair of the North Caspian Environmental Oil Spill Response Base in the village of Damba, Atyrau region – works on repair and painting of floors with epoxy-polyurethane coating, incl
2023
Phase 3 of the current repair of the North Caspian Oil Spill Response Environmental Base in the village of Damba, Atyrau region. Works include floor repair and painting with epoxy-polyurethane coating, including sealing of expansion joints. The base is designed for oil spill response, animal rehabilitation, and staff training. We ensure high-quality, durable flooring and equipment protection. All works are performed following safety and environmental standards. Modern materials and technologies are used. Personnel have completed the necessary training. Construction is carried out with minimal environmental impact.