Design and survey work:
Development of design and estimate documentation for the facility: Closed substation 110/10 kV "Severnaya" with a cable line 110 kV
Development of design and estimate documentation for the facility: Double-circuit 110 kV overhead line from the projected 110/10 kV Nursaya substation to the 110/35/6 kV substation Uzlovaya
Development of design and estimate documentation “Open substation 110/10 kV Airport” with an overhead line 110 kV from Substation Nursaya.
Development of design and estimate documentation for the construction of distribution point 11 and cable lines from the 110/10 kV substation "Stary Gorod".
Development of design and estimate documentation for the expansion of outdoor switchgear-110 kV by two cells of the SS-220/110/10 kV "Atyrau-220" for connecting the double-circuit overhead line-110 kV "Uzlovaya-Atyrau 220".
Development of design and estimate documentation for a distribution point and cable lines from the 110/10 kV substation "Zhumysker" to RP No. 32, 33, 34, 35.
Development of design and estimate documentation for the construction of external power supply for the water pumping station of the water supply system in Kulsary
Development of design and estimate documentation for the facility: Construction of a water pipeline for the TCO Transit Hotel in Atyrau
Development of design and estimate documentation for the object: Construction of engineering and communication infrastructures in the village of Ganyushkino.
Development of design and estimate documentation for the construction of external engineering networks under the Zhas otau program for the object "Construction of a 120-apartment residential building in Atyrau, Nursaya microdistrict"
Development of design and estimate documentation for the construction of a pressure sewer from the residential town of Vaternas Stroy LLP to the sewer system of the Samal rotational camp on Karabatan
Development of design and estimate documentation for the overhaul of the basement floor at the address: Atyrau, Amanshina street-74.
Construction and installation works:
Construction of 110 kV cable lines from Substation 110/10 Tendyk.
Construction of distribution points 12, 14 and cable lines from SS 110/10 kV "Tendyk".
Construction of a distribution point and cable lines from the 110/10 kV substation "Zhumysker" to RP 32, 33.
Construction of a 110 kV cable line from SS 110/10 kV Severnaya to 110 kV overhead line SS-220 Atyrau - Uzlovaya, Atyrau.
Reconstruction of electric networks of the Indersky district, the area of the Multi-storey building ZTP 2/3 and the ATP area, the village of Inder.
Construction of a 18-10 kV distribution point from the 110/10 kV Severnaya substation, Makhambet district, Almaly rural district.
Railway crossing lighting construction Chevron Munaigas Inc.
Construction of a cable insert to replace the section of the 110 kV overhead line between supports 56, 57.
Execution of electrical work on the project: "Expansion of the plant for the production of pipes in Atyrau, Chevron Munaigas Inc."
Construction of a 110 kV cable insert at the 110 kV transmission line of the APEC - 110/10/10 kV substation Nursaya with branches to the 110/10 kV substation Zhumysker and substation 110/35/10
Water pipeline construction for TCO Atyrau Transit Hotel
Construction of 10 kV overhead lines and cable lines under the Agip KCO project on the territory of Karabatan
Installation of support No. 97 on the 110 kV ATES-Nursaya overhead line and entry to the Nursaya substation
Modernization of 220 kV substations "Atyrau, Tengiz, Inder, Beineu" of the Western MES branch. II stage
CPC Expansion Project Kazakhstan Section "MTO and Construction of an External Power Supply System for PS in the Republic of Kazakhstan"
Construction and reconstruction of water treatment facilities with water supply networks in the villages of Ganyushkino, Zhumeken, Shortambay, Kadyrka. Urmangazinsky district of Atyrau region.
Overhaul of street lighting in the village of Inderbor, Inder district, Atyrau region
Overhaul of a gravity sewerage line to residential buildings in the city of Kulsary, Zhyloy district, Atyrau region
Construction of water lines at junction No. 402 (PMS) in the rural district of Baigetobe, Makat district, Atyrau region
Installation of process pipelines at the Atyrau Oil Refinery.
Overhaul and chemical washing of steam boilers in the steaming station of the Atyrau Oil Refinery.
Construction of water supply and gas pipeline networks in microdistrict Vodnikovo-3, Atyrau.
Construction of a 10 kV overhead line from SS 35/10 kV No. 23 "Egizgul" to the village of Akzhayik with an interval to the village of Esbol, Makhambet district
Construction of summer water supply networks in the village. Eltai and Zharsuat village, Indersky district, Atyrau region
Installation of hot water boilers and pumps in the Boiler House in Kulsary
Deepening the bank of the Kushum River in the territory of the state hunting economy Kirovsky West Kazakhstan Region III-stage Zelenovsky district, Kushumsky rural district
Construction of drinking water pipelines in the village of Shokpartogai, Zhylyoi district, Atyrau region
Construction of the substation SS-35/6 "Shalkiya Vodovod" in the village of Zhanakorgan, Kyzylorda region
Construction of a 10 kV overhead line, a 0.4 kV overhead line and a KTS-160/10 for energy saving in the village of Kigash, Kurmangazy district, Atyrau region
Construction of a 35 kV overhead line, 35 kV cable line from SS-35/6 "Shalkiya Vodovod" to SS-220/35/6 "Concentration Plant" in Zhanakorgan district of Kyzylorda region
Construction of a 220 kV overhead line at the SS-220/35/6 "Concentration plant" in the Zhanakorgan district of the Kyzylorda region
Dismantling of the VST (vertical steel tank) 5000 m3 No. 1 at the facility of PS "B. Chagan" JSC "KazTransOil" in Uralsk, West Kazakhstan region
Dismantling of the plant for the preparation of a pour point depressant at the facility of the MOPS "Kumkol" JSC "KazTransOil" in the Ulytau district of the Karaganda region
Dismantling of a canopy for process equipment and three booster pumping units at the facility of the MOPS named after B. Dzhumagaliev of KazTransOil JSC in the Ulytau district of the Karaganda region
Transfer of external water supply networks for the reconstruction of 14.9 km of the intra-settlement road in the village of Makat, Makat district, Atyrau region
Repair of the perimeter fencing of the PRRS at the facility of 175 km, 148 km, 123 km, 87 km, 26 km of the Kenkiyak-Orsk MN of KazTransOil JSC in Aktobe region
Repair of sludge sites No. 1,2,3,4 at the facility "OPS Inder" JSC "KazTransOil" in the Inder district of Atyrau region
Current repair of the fencing of the coastal strip of the sanitary zone of the WTP at the facility "NPS Inder" of JSC "KazTransOil" in the Inder district of Atyrau region
Carrying out works on sand retention along the Kobyakovo-Zaburyn canal, Isatai district, Atyrau region
OPS named after T. Kasymov. Reconstruction of the launch CaDT chamber  of the Uzen-Atyrau-Samara oil pipeline" in Atyrau, Atyrau region.
Reconstruction of the power supply of the MOPS "Uzen" in Zhanaozen in the Mangistau region.
Construction of a 10kV cable line and installation of a block-modular CS-10kV at the Zapadnaya Prorva field, Zhylyoi district, Atyrau region
Construction of a 10 kV overhead line from SS-110/10 Prorva to CMB 10 kV at the Zapadnaya Prorva field, Zhylyoi district, Atyrau region
Construction of a 6 kV overhead line at the Koshkar field, Makat district, Atyrau region
Construction of a summer water supply line in the village of Almaly, in the city of Atyrau
Carrying out work on sand retention in the village of Ushtagan, Kurmangazy district, Atyrau region
Construction of the electrical network of the microdistrict. Moltek-3, Moltek-4 in the village of Miyaly, Kyzylkoginsky district, Atyrau region
Construction and installation work of the NCEOSRB base in the village of Damba. Repair and painting of EPUC floors. Project of KazMunayGas JSC
Construction and installation work of the NCEOSRB base in the village of Damba. Supply and installation of a water treatment plant. Project of KazMunayGas JSC
Construction and installation work of the NCEOSRB base in the village of Damba, Atyrau region. Reconstruction of power supply and replacement of video surveillance system. Project of KazMunayGas JSC
Sponsorship
Construction of the Mausoleum
Bukei Khan
In the village of Maly Aral, Krasnoyarsk district of the Astrakhan region, the mausoleum of Bukei Khan was built. In the history of the Kazakhs, Bukei Khan occupies a special place. Having formed the Bukey Horde in the interfluve of the Urals and the Volga, he not only preserved his people, but also united our peoples 300 years ago.

The memorial complex at the place where Bukei Khan and Seit Baba are buried consists of several structures. The mausoleum of Bukei Khan became its center. The mausoleum was erected at the expense of entrepreneurs, among whom was our company LLP "TESS-Proekt".
Participation in construction
Aiteke bi Mosques
TESS-Project LLP took an active part in the construction of the Mosque to the great Kazakh biy Aiteke bi in Uzbekistan.
Aiteke bi from the Alim clan, a subgenus of cake-kara, the Younger Zhuz, the grandson of the brother of the famous Samarkand Jalantos-batyr.
A beautiful mosque was built on the territory of the complex, everything necessary for its interior decoration was purchased, in addition, the territory of the complex was landscaped, water was supplied to the objects. A fountain operates on the territory of the complex, refreshing the hot summer air with coolness.
Sponsorship in the release
Music album
TESS-Project LLP takes an active part in supporting young talents.
With the sponsorship of TESS-Project LLP, a young and talented musician Nurzhan Tazhikenov released his debut album called "TOREMURAT". This album consists of 15 compositions performed by Nurzhan on dombra. All compositions are imbued with the spirit of the Kazakh steppe and love for the motherland. Also, with sponsorship, video clips "Adai" and "Sagynysh" were released.
LLP "TESS-Project" sponsored Nurzhan's solo concert.
And in the future he plans to sponsor young and talented people of our vast Motherland.
Contact us:

8 (7122) 29-28-73

The Republic of Kazakhstan,

Atyrau region, Atyrau,

Isatai avenue, building 1/2

LLP "TESS-Project"

Working hours

Monday

08:00 - 18:00

Tuesday

08:00 - 18:00

Wednesday

08:00 - 18:00

Thursday

08:00 - 18:00

Friday

08:00 - 18:00

Saturday

08:00 - 12:00

Sunday

Weekend

*Lunch break

12:00 - 14:00